Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
+86-13921192921
All Products
View :
Unit Price: 62000~80000USD
Brand: Yuda
Packaging: 20GP
Supply Ability: 6sets/month
Min. Order: 1 Set/Sets
Certificate: CE,ISO,SGS
Unit Price: 22000~30000USD
Brand: Yuda
Packaging: Plywood Cases
Supply Ability: 5sets/Month
Min. Order: 1 Set/Sets
Certificate: CE,ISO, SGS
Unit Price: 30000~43000USD
Brand: Yuda
Packaging: 20GP
Supply Ability: 6sets/month
Min. Order: 1 Set/Sets
Certificate: CE,ISO,SGS
Unit Price: 62000~80000USD
Brand: Yuda
Packaging: 20GP
Supply Ability: 6sets/month
Min. Order: 1 Set/Sets
Certificate: CE,ISO,SGS
Unit Price: 110000~160000USD
Brand: Yuda
Packaging: 20GP
Supply Ability: 6sets/month
Min. Order: 1 Set/Sets
Certificate: CE,ISO,SGS
Unit Price: 13000~20000USD
Brand: Yuda
Packaging: Plywood Cases
Supply Ability: 10sets/Month
Min. Order: 1 Set/Sets
Certificate: SGS, CE, ISO
Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.
All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-Insulated Pipe Fabrication, It will use workshop Fitting Machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting Welding Equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling
Email to this supplier
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.